The Gorge
Back Up Next

 

 

Up

The Gorge

 

The Gorge has been an area on our layout left unfinished for several years. The why is unimportant, but we are finally ready to start. 

If you look closely at the area you can count a total of six bridges that need to be placed and worked in over the yet to be river. Two of the front facing bridges are of a wooden trestle design and one of the crossings in the rear is a small wooden bridge which has been super detailed. Hopefully it will fit in perfectly with the soon to be scenery. Two of our main lines cross this gorge and the bridges for these lines will reflect this usage. These have not yet been completed but are being worked on.

Stayed tuned for further updates as we move along on our construction.

 

An overall view of the area to be worked on. Some of the rough scenery has been completed and the basic outlines of the gorge has been set. The gorge is located next to our logging area and should fit in nicely with the theme.
A view from the front showing two of our wooden trestle bridges.
Another front view.
The view from the rear showing one of the main lines where a new bridge will be installed to replace the plywood board we now have crossing the gorge. This view also shows the narrow gauge line and the soon to be placed 'Dinky Creek' bridge.
It's February 20 and Chugger is getting ready to start the scenery on the 'Gorge'. Here he's rounding up and preparing the molds to cast several different wall sections for the area.
It's mid March and we can see Hugh has started to work in one of the tunnel protals. Also to the left in the picture we can see one of the stone retainer walls he has added. The bridge above is temporary and will soon be replaced,
Hugh has added another portal below the steel bridge in this picture.